Skip to content
Home
Favourites
0
Advanced Search
Shopping Cart
0
Register
Log In
Images of Edinburgh
Browse Map
Area A - Z
Browse by Date
Exhibitions
Current Exhibition
All Exhibitions
Collections
About the Collections
Browse by Theme
Subject A - Z
The image library for the collections of Edinburgh Libraries and Museums and Galleries
Images of Edinburgh
Browse Map
Area A - Z
Browse by Date
Exhibitions
Current Exhibition
All Exhibitions
Collections
About the Collections
Browse by Theme
Subject A - Z
Subject matches "Adults" or its children
Back to search results
Bay C Demolition during refurbishment of North Bridge
Balfour Beatty, 2022, Digital image
Item
of 5,000
Bay C Demolition during refurbishment of North Bridge
Bay C Demolition during refurbishment of North Bridge
Add to Favourites
Share
Item record
About this image
Related
Location
Responses
Category
Library Item
Item no
54118
Title
Bay C Demolition during refurbishment of North Bridge
Description
Photograph taken on 1 March 2022 during North Bridge refurbishment
Artist / maker
Balfour Beatty
Date
2022
Type
Digital image
Copyright
North Bridge Refurbishment Project, Balfour Beatty
The North Bridge was constructed over the period 1894-97 by Sir William Arrol. He was also the contractor responsible for the construction of the Forth Rail Bridge.
The last major refurbishment works were undertaken in 1933. In the early 1990s, the decorative facings were painted and new parapets were installed with decorative covers of spheroidal cast iron.
The bridge is category A designated, situated in the Edinburgh World Heritage Site. North Bridge carries the A7 over Waverley Station providing a vital transport link connecting the Old and New Towns of Edinburgh. The bridge comprises three spans, each of approximately 53m. Each span has six steel main arch girders with a concrete deck, masonry piers and abutments, and a decorative cast iron façade.
North Bridge refurbishment project
In March 2018, the Council agreed to invest in refurbishing the structure after inspections between 2014 and 2017 identified various defects. A complex scaffolding was installed to gain access to areas not accessed for 125 years. As work progressed, it became clear that more repairs would be required than initially anticipated. These repairs have been addressed as part of a major project with various technical challenges.
The works present an opportunity to use modern engineering techniques, technology and understanding and should ensure that the bridge remains fit to serve future generations.
The works to North Bridge include:
• Grit blast and repaint all structural steelwork, last renovated in 1933
• Assessment led repairs to structural steelwork and cast-iron springer bearings
• Condition led structural steelwork repairs and cast-iron springer bearing refurbishment
• Refurbish historic cast iron bridge façades including the redesign of façade fixings. This will allow for sectional movement and easier future repairs.
• Grit blast, repair, seal repaint parapets; assess and repair internal vehicle restraint system
• Repairs to the topside, underside and full depth replacement in sections of the bridge's concrete deck. This includes a carbon fibre reinforced plastic wrap and anti-carbonation coating for the deck’s soffit
• Install cathodic protection and structural health monitoring systems to the reinforced concrete deck
• Repair and improve the footway paving and underdrainage
• New waterproof membrane to renovated bridge deck
Public realm improvements including new lighting, bus shelters, and carriageway resurfacing
• Improve bridge drainage systems and drainage network tie-ins
• Replace steel secondary structures over the abutments and piers with reinforced concrete slabs
• Remove all redundant utility pipes and ducts and rationalise those services that remain
• Replace the expansion joints with allowance for expansion in sections not originally considered
• Repair and repoint masonry in areas most susceptible to deterioration
• Restore and repair the King's Own Scottish Borderers War Memorial
• Install permanent platforms to improve access provisions for future inspection and minor maintenance
• All temporary scaffolding required to access the structure
The benefits of refurbishing the North Bridge include:
• Restore and maintain the historic and vital link for current and future generations Improve access provisions for future maintenance
• Community benefits which are an essential part of the project delivery. One being education via engagement with local schools and universities.
• Opportunities for placements
• Career support for young people, ex-offenders and people with disabilities
• Fundraising and volunteering for local charities as part of the project’s social outreach programme.
Exhibitions with this item
The North Bridge
Other views of this item
Related images
Related subjects
Government
>
National
>
National government buildings
Homes
>
Residential buildings
>
Hotels
Manufacturing Industry
>
Manufacturing equipment
>
Diggers
Manufacturing Industry
>
Manufacturing equipment
>
Hoarding
Manufacturing Industry
>
Manufacturing equipment
>
Scaffolding
Manufacturing Industry
>
Manufacturing facilities
>
Engineering works
People
>
Adults
>
Men
Places
>
Edinburgh Landmarks
>
North Bridge
Transport
>
Infrastructure
>
Bridges
Transport
>
Infrastructure
>
Road bridges
Transport
>
Infrastructure
>
Roads
Transport
>
Infrastructure
>
Roadworks
Transport
>
Infrastructure
>
Traffic cones
(55°57′7″N, 3°11′20″W)
Search Location
Read how our collections have inspired people taking part in events, visits and community groups. Use the slider or navigation arrows to see more responses.
People were asked…
Response